Asbestos Removal in Mercer Island

Bellevue Asbestos Removal takes on asbestos work for Mercer Island homes and condos, from testing to removal and teardown prep. About 61% were built before 1980, so any remodel here begins by asking what the work will touch.

Mercer Island has about 10,600 homes. The 1960s are the biggest building decade, with roughly 2,500 homes, two-thirds of homes are one-unit homes, and about a third of households rent.

Request a free quote
An empty utility closet with a metal duct at the ceiling, a gray panel on the back wall and plastic sheeting on the floor

Asbestos removal services

Asbestos testing and surveys

On Mercer Island, sampling comes before the sledgehammer. Whatever a remodel will touch is tested first, by the resident owner personally or, for rentals and demolitions, by a certified inspector. See asbestos testing and surveys for the process.

Popcorn ceiling removal

Mercer Island has about 4,200 homes from the 1960s and 1970s together, roughly 2,500 and 1,700, and ceiling texture from those decades is worth sampling. The wet method is described under popcorn ceiling removal.

Floor tile and sheet vinyl

Entries, kitchens and laundry rooms of that era may carry vinyl tile or sheet vinyl over an older layer. How layers and backings are handled is explained under floor tile and sheet vinyl removal.

Siding and roofing

Cement shingles and some roofing can contain asbestos. Shingles come off whole and wet, as described under siding and roofing removal.

Pre-demolition abatement

Demolition in Mercer Island comes with a city asbestos form, covered further down this page. For the steps in order, see pre-demolition asbestos abatement.

Mercer Island’s housing and asbestos

Roughly 6,500 homes on Mercer Island, about 61% of the city’s 10,600, were built before 1980. Another way to see it: about one home in ten is older than 1950.

The 1950s and 1960s

The 1960s produced about 24% of Mercer Island’s homes and the 1950s about 11% more. Sample ceiling texture, vinyl flooring, siding and old duct wrap first. Age only points to where to look, and homes that old can test clean.

The city’s demolition form

A Community Planning and Development form on asbestos policy for demolitions, dated February 2019, says Mercer Island requires proof of compliance with asbestos abatement regulations before issuing a demolition permit. The form adds that a survey is required before most renovations and all demolitions, and that a Notice of Intent to Perform a Demolition goes to PSCAA before any demolition starts. Ask the city’s permit office before a demolition what it requires now.

Disposal

Waste from Mercer Island has two listed destinations. One is Cedar Hills Landfill in Maple Valley, which books appointments on Tuesdays and Fridays and wants double bags or 6-mil plastic. The other is Republic Services in Seattle, which also asks for a copy of the PSCAA notice.

Owner-occupied and rented homes

Two-thirds of Mercer Island homes are one-unit homes, so the owner-occupant route is relevant here. A resident owner of a single-family house may do the survey and removal personally, though PSCAA still strongly encourages a certified contractor. Friable removal past the small-quantity limits needs a Single-Family Residence Notification beforehand.

Rented homes, condos and apartments call for a certified contractor, and buildings of five or more units hold about 32% of the island’s homes. If a house is headed for demolition, a certified inspector surveys it even when the owner lives there.

Attic with long wrapped heating ducts running along the rafters over loose white insulation, with a work light

Frequently asked questions

Does Mercer Island require proof of asbestos compliance for a demolition permit?

A city form dated February 2019 says it does. Ask Community Planning and Development what it requires now.

Is Mercer Island covered by the Puget Sound Clean Air Agency?

Yes. PSCAA’s territory includes King County, and the island is part of it. State L&I rules apply as well.

Where does asbestos waste from Mercer Island go?

Both outlets on PSCAA’s list can take waste from Mercer Island. Cedar Hills Landfill works by appointment on Tuesdays and Fridays, and Republic Services is in Seattle. Either one wants a waste shipment record.

Can asbestos be sealed instead of removed?

It depends. Asbestos that nobody will touch can be left alone, or repaired or sealed without a PSCAA notice, and removal is the third path PSCAA lists. A project that will cut or sand the material has to choose removal.

Clyde Hill homeowners can read asbestos removal in Clyde Hill, since most of its homes are owner-occupied.

Request a free asbestos removal quote

We recommend calling, but do feel free to contact us using this form. We'll get back to you with a free, personalized quote or additional questions as soon as possible. We're here to help.